20211207 Bungalow construction (door lock reference) - day 154
References and ideas for the door lock mechanism that Arie and his crew are working on
igb
26.94
4 years ago
Hive.Blog
20211203 Bungalow construction (bedroom shutters) - day 150
Each of the 8 bedroom windows gets a wooden shutter. Shutters are installed inside. Custom metal hinges made by Arie and crew connect ...
igb
26.94
4 years ago
Hive.Blog
20211201 Bungalow construction (workshop steps) - day 148
Fabrication of the steps to access to workshop Sanggah temple intersecting steps bring tight interaction between the two structures.
igb
26.94
4 years ago
Hive.Blog
20211129 Bungalow construction (water well digging complete) - day 146
The boring of the well which started 40 days ago is finally complete. Water tested at a depth of 60 meters was plentiful and high qualit...
igb
26.94
4 years ago
Hive.Blog
20211128 Bungalow construction (ceiling fixtures) - day 145
Ceiling fans and spotlights Main space Bedroom Bedroom electrical panel
igb
26.94
4 years ago
Hive.Blog
20211126 Bungalow construction (Trimdek walls) - day 143
Inside the main space East swing wall. This entire wall swings open to offer an unobstructed view of the rice fields. West swing wall. ...
igb
26.94
4 years ago
Hive.Blog
20211124 Bungalow construction (Sanggah temple complete) - day 141
The Sanggah temple is complete. It is made of concrete, bricks and plastered with cement mixed with black sand from the nearby beach foll...
igb
26.94
4 years ago
Hive.Blog
20211123 Bungalow construction (outdoor light fixtures) - day 140
Installation and test of 20 exterior light fixtures on two bungalows.
igb
26.94
4 years ago
Hive.Blog
20211121 Bungalow construction (cement tiles) - day 138
The cement tiles that we designed and produced a couple of months ago are now being installed on the toilet walls of both bathrooms.
igb
26.94
4 years ago
Hive.Blog
20211119 Bungalow construction (window glass install) - day 136
Glass is being installed today on 8 bedroom windows.
igb
26.94
4 years ago
Hive.Blog
20211116 Bungalow construction (Sanggah temple progress) - day 133
Prepping for the fabrication of the top part of the temple Working on the last structural element. Temple is complete. Last step is ...
igb
26.94
4 years ago
Hive.Blog
20211113 Bungalow construction (kitchen pantry) - day 130
Pantry side walls are made of reinforced concrete The back wall is cement plastered. Direct connection from cement plaster to metal...
igb
26.94
4 years ago
Hive.Blog
20211111 Bungalow construction (Trimdeck walls) - day 128
Installation of the Trimdek on the metal frames of the walls of the main space has started. It I the same marterial that we used on t...
igb
26.94
4 years ago
Hive.Blog
20211110 Bungalow construction (rounded corners) - day 127
All cement and concrete walls have 2cm radius rounded corners. Bedroom. Unfinished wall. Workshop. Finished wall.
igb
26.94
4 years ago
Hive.Blog
20211109 Bungalow construction (door lock) - day 126
Today Arie is showing us progress on the there-point locking system that he's been working on for entrance doors. Designing and buildin...
igb
26.94
4 years ago
Hive.Blog
20211108 Bungalow construction (electrical fixtures placement) - day 125
We're almost at the stage where we can install electrical fixtures. Since many fixtures are installed following pentagonal symmetry, we'...
igb
26.94
4 years ago
Hive.Blog
20211107 Bungalow construction (new well drill) - day 124
We had been warned by the locals that it would be challenging to drill a water well. The underground in the is area of Bali is composed o...
igb
26.94
4 years ago
Hive.Blog
20211106 Bungalow construction (bedroom wall textured finish) - day 123
The first wall finish sample is not conclusive. They did a lazure with vertical strikes which is not what we are looking for. In order...
igb
26.94
4 years ago
Hive.Blog
20211105 Bungalow construction (outdoor light fixture) - day 122
We're trying to hire local artisans as often as possible. It is not uncommon to have discrepancies between the original design and the re...
igb
26.94
4 years ago
Hive.Blog
20211104 Bungalow construction (bedroom shutters) - day 121
The wood for the bedroom shutters is going stay natural. We keep the stains and the marks of time. After gentle sanding, planks will be ...
igb
26.94
4 years ago
Hive.Blog
20211102 Bungalow construction (bedroom electrical conduits) - day 119
Positioning fixtures, switches and outlets with bed axis as reference. Prepping wall to receive conduit for main electrical panel ou...
igb
26.94
4 years ago
Hive.Blog
20211030 Bungalow construction (workshop wall smooth render) - day 116
Workshop entrance Electrical switches Witnessing water well being drilled through workshop entrance Mixture of cement and plaster for ...
igb
26.94
4 years ago
Hive.Blog
20211029 Bungalow construction (main space wall frames) - day 115
The only brick wall in the main space with entrance door and electrical panel. The kitchen wall with single wall-long shutter. Met...
igb
26.94
4 years ago
Hive.Blog
20211028 Bungalow construction (bedroom walls plastering) - day 114
igb
26.94
4 years ago
Hive.Blog
20211027 Bungalow construction (silver plated hardware) - day 113
We're planning to use silver plating as an anti-rust solution for the custom metal hardware that we are designing. Our silversmiths in Ce...
igb
26.94
4 years ago
Hive.Blog
20211026 Bungalow construction (gutter puzzle) - day 112
PVC rain gutters are installed all around the roof of each structure. Water is collected from the gutters at each corner, so 5 times per ...
igb
26.94
4 years ago
Hive.Blog
20211025 Bungalow construction (outdoor wall light) - day 111
There's an opportunity for a recessed outdoor light fixture on both sides of each column. Here's a drawing of our second (and final) vers...
igb
26.94
4 years ago
Hive.Blog
20211024 Bungalow construction (bedroom wall color) - day 110
The bedroom walls with be colored dans la masse. To that end we add pigments to the cement used for the last coat and we will probably ke...
igb
26.94
4 years ago
Hive.Blog
20211023 Bungalow construction (bedroom wall construction) - day 109
Arie and his team install door frames Windows flanking columns Behind this wall is the bathroom Inside bathroom General view wit...
igb
26.94
4 years ago
Hive.Blog
20211021 Bungalow construction (roof gutter) - day 107
PVC gutter Custom metal brackets for gutter Installing gutter on bedroom roof Gutter installed.